All electronics are going to be assembled and should be back in 3 weeks (per quote) including shipping time.
Ongoing debug with Sector 1 which has both RPC and scint layers.
Other layers in the barrel can be readout via pocketdaq without any problems.
UH to send indiana a 127 MHz osc so they can populate their HSLB.