16-July-2015 US Belle II HW/FW Meeting

→ Pacific/Honolulu
    • 9:00 AM → 9:10 AM
      KLM: HW, FW, TargetX Tests, open issues 10m
      Slides
      Use spacers for the the plastic backing so they wont put pressure on components.
      Management to decide who is going to pay for the shipment of the COPPER crate from KEK to HNL to be used by UH testing.

      Solder the anchors of the HV connectors to the RHIC board.
      RPC crate overhaul including cooling fans.
      probably a SOT23 part is better than a leadless smd part for Schotkey diaode.
    • 9:10 AM → 9:25 AM
      TOP Testing: Module 01 FW 15m
    • 9:25 AM → 9:35 AM
      TOP KEK: Debugging 10m
    • 9:35 AM → 9:40 AM
      TOP HW: Carriers, laser, SC 5m
      all the 15 boards were tested. . already sent test data to hawaii. the next batch is 22 boards and already started testing.

      UH received the next batch (42 ) which are being engraved. Going to ship 39 to Pitts probably on Monday.
      the first batch of carriers revision A3 is being delayed. so it will get to UH on 7/27.
      One functional scrod B2 and 4 carriers will be sent to Gerard for his studies.

      It is recommended to push pogo pins only half way down. and see about 17~18 rms of noise.
    • 9:40 AM → 9:50 AM
      TOP HW: SCRODs, Pittsburgh 10m
      Slides
      Problem with DRAM tests.

      Get boards to Gerard for power supply testing
    • 9:50 AM → 9:55 AM
      TOP FW: feature extraction, belle2link and overall 5m
      Slides