iTOP Electro-Optical-Mechanical Dedicated Workshop
→
Pacific/Honolulu
TBD (Virginia Tech)
TBD
Virginia Tech
Blacksburg
James Fast
(PNNL)
-
-
1
Intro/Outline of meetingSpeakers: Bob Thompson (PNNL), James Fast (PNNL)
-
Meeting Logistics and OverviewConvener: Robert Thompson
- 2
-
QBB Introduction
Forward and backward end concepts.
Quartz locating/fixing.
Review 3D CAD model. -
3
Discussion - Securing quartz in QBB
- 4
-
PMT Module
3D Model review and Discussions
-
Readout Module
-
Laser Calibration Integration
Working Lunch
-
QBB Structure
Structural Requirements
3D Model Review and Discussion -
Module Assembly Through Installation
Map full lifecycle of iTOP module components through completed detector system installed in ECL.
-
Belle II Interface Topics
iTOP Detector Utilities
Potential modifications to CDC support cylinder.
CDC electronics and inner detector cabling vis-a-vis servicing iTOP. -
Closeput
Review of decisions taken
Action items and assignmentsConvener: Bob Thompson
-
1