27-Aug-2015 US Belle II HW/FW Meeting

Pacific/Honolulu
    • 1
      KLM: HW, FW, TargetX Tests, open issues
      more information
    • 2
      TOP Testing: Module 01 FW
    • 3
      TOP KEK: Debugging
    • 4
      TOP HW: Carriers, laser, SC
      Testing: everything is going on as planned.
    • 5
      TOP HW: SCRODs, Pittsburgh
      2 of the scrods did not have the 14 pin connector installed, was not a big problem.
      with the TJ Hooker, the tech said he can make betwrrn 14-16 boards per week. so it will be over 4-6 weeks spread over the time.
      need a schedule to know when there is a need for how many TJ hookers.

      Gerard to visit Pitt and the shop there on Wednesday.

    • 6
      TOP FW: feature extraction, belle2link and overall
      Lynn:
      The data corruption issue is solved.
      Switched to 1G Ethernet card and the packet loss wentaway.
      Eric is working on stuff