by
Prof.Makoto Tobiyama(KEK Accelerator Laboratory)
→
Pacific/Honolulu
112 (WAT)
112
WAT
Description
The Phase 1 commissioning of SuperKEKB rings without superconducting final focus magnets or Belle-II detector began in Feb., 2016. A total of 1010 mA (LER) and 870 mA (HER) stored beam has been achieved close to the design emittance and x-y coupling. Most of the beam diagnostics, including new systems such as gated turn-by-turn monitors and X-ray beam size monitors, have been commissioned with beam and proved to be essential to the success of machine commissioning. The results of the beam commissioning, including difficulties will be presented.