27-Aug-2015 US Belle II HW/FW Meeting

Pacific/Honolulu
    • 9:00 AM 9:10 AM
      KLM: HW, FW, TargetX Tests, open issues 10m
      more information
    • 9:10 AM 9:25 AM
      TOP Testing: Module 01 FW 15m
    • 9:25 AM 9:35 AM
      TOP KEK: Debugging 10m
    • 9:35 AM 9:40 AM
      TOP HW: Carriers, laser, SC 5m
      Testing: everything is going on as planned.
    • 9:40 AM 9:50 AM
      TOP HW: SCRODs, Pittsburgh 10m
      2 of the scrods did not have the 14 pin connector installed, was not a big problem.
      with the TJ Hooker, the tech said he can make betwrrn 14-16 boards per week. so it will be over 4-6 weeks spread over the time.
      need a schedule to know when there is a need for how many TJ hookers.

      Gerard to visit Pitt and the shop there on Wednesday.

    • 9:50 AM 9:55 AM
      TOP FW: feature extraction, belle2link and overall 5m
      Lynn:
      The data corruption issue is solved.
      Switched to 1G Ethernet card and the packet loss wentaway.
      Eric is working on stuff